News

Read More
Read More

Read More


About OIEC
OIEC was incorporated in 1987. The Company has since taken major steps to become capable of rendering a complete range of EPC services in the energy sector. Today OIEC is a comprehensive service provider for EPC projects. We have achieved and intend to keep this position with the help of employing high caliber professional staff, utilizing state of-the-art technologies and striving rigorously to render world class services to our clients. Today OIEC is considered as one of the most capable compaines to be involved in E&P activities in iran .
Services
-
Downstream
Projects Management, Engineering, Procurement, Construction, Commissioning, Start-up and Operation of:
Oil and Gas Refineries
NGL Plants
Petrochemical Plants
Oil and Gas Pipelines -
Upstream
Developing Onshore and Offshore fields by providing Upstream Services including:
Exploration Studies including preparing MDP
Geology, Petro-physics and Geophysics Services
Drilling Completion & Well Services
Commissioning and Startup
Operation

Social Responsibility
OIEC Group is focusing its responsibilities on environment, people and society as a critical factor to be able to continue operating effectively. We believe that communicating with the people who are affected by our operations is greatly important. To achieve this, we were able to deliver what we promised such as building a school in Assaluyeh.
-
Azar Oil Field Development
Azar structure is an asymmetric anticline located in the Anaran exploration block in the foreland basin of the Zagros fold and thrust belt along the Iran-Iraq border. Total length of the field (on top of Ilam Fm.) is more than 36.5 km including the extension in Iraq, approximately 13.5 km on the Iranian side. The development plan is designed to produce 65,000 BOPD of which 30,000 BOPD will be reached in the first stage (early production).

-
NGL 3100
As another significant project in NGL industry, NGL-3100 plant is being designed and constructed by OIEC near the oil production unit of Cheshmeh khosh, a town in Ilam Province. The project is defined to reach the optimal recovery of C2+ product from the associated gases of North Dezful oil fields that at present are being burnt causing both pollution and noticeable losses of gas revenues.
OIEC Subsidiaries
-
Energy Industries Engineering and Design (EIED), founded in 1996, was initially formed as the engineering arm of OIEC to promote the knowledge and technology for design and engineering.
-
Oil and Energy Industries Development (OEID) was established in 1997 as a subsidiary of OIEC. The company’s core area of expertise is in upstream projects, including oil and gas exploration, field development and related upstream engineering services.
-
Kish Petroleum Engineering (KPE), incorporated in 1999, is performing as the upstream engineering arm of OIEC. KPE has a significant record of upstream projects including field studies, MDP preparation, drilling technical services and supervision and technical consultancy.
-
Oil Industries Commissioning and Operation (OICO) was incorporated in 2011 as the professional arm of OIEC to meet the increasing needs for an up-to-date, systematic and professional approach to lead pre-commissioning, commissioning and operation stages of a noticeable number of projects in the local and regional markets.
-
The “Buyback Service Contract” for Development of Azar Oil Field was signed between National Iranian Oil Company (NIOC) and a Consortium consisting of Oil Pension Fund Investment Company (OPIC) and Oil Industries Engineering and Construction (OIEC) in March 2012. Subsequently, with NIOC approval, execution of the Contract was assigned to newly established company, Sarvak Azar Engineering and Development (SAED) in July 2012.
-
Saba Rig Providing (SRP) is one of the OIEC Group companies involved in upstream activities to provide different types of Drilling Rigs in terms of daily rate contracts. So far this company is the owner of two heavy land rigs (2000 HP) carrying out drilling in the intricate oilfields of NISOC.