Azar Oil Field Development

Founded in 2012 as a project company, Sarvak Azar Engineering and Development (SAED) held the responsibility to develop Azar Joint Oil Field. With shares of OIEC and Ahdaf Investment Company, SAED relies on local expertise and experience to develop one of the most complicated fields in the world. SAED has already met his commitment to produce 30,000 BOPD as planned and now successfully has increased production to his contractual commitment, 65,000 BOPD. Having proven his capabilities, SAED is currently ready to continue the field development through IPC to reach 100,000 BOPD.

Picture Gallery

Location Ilam / Iran
Cient petroleum engineering and development company
OIEC Scope (Onshore) • Drilling and Completion of 19 wells
• Installing central processing facilities with capacity of 71,500 BOPD and gas transferring with capacity of 78 MMSCFD
• Construction of 129 km of 16” pipeline for oil transferring to Dehloran production unit
• Construction of 129 km of 16” pipeline for gas transferring to Dehloran (NGL 3100)
• Construction of 58 km of 16" pipeline for oil transferring from Dehloran to the beginning of Cheshmeh Khosh transferring line
• Construction of flow lines for 17 wells
• Construction of residential facilites
Products Crude Oil: 65,000 BOPD