Esfahan Lube Oil Complex
PROJECT CONSTRUCTION, ERECTION & PRE-COMMISSIONING OF ESFAHAN LUBE OIL COMPLEX
LOCATION ESFAHAN / IRAN
CLIENT/OWNER NIOC- NIOPDC (National Iranian Products and Distribution Co.)
MANAGING CONTRACTOR (MC)  OIEC
CONTRACT EFFECTIVE DATE MARCH 1989
CONTRACT DURATION 33 months
BUDGETED man-hours 4,200,000 man-hours
EXPENDED man-hours 4,050,000 man-hours (REV.12)
PROGRESS STATUS COMPLETED (MARCH 92)




Scope of Work

Execution of construction, erection and pre-commissioning of Esfahan Lube Oil Complex with a capacity of 184,000 metric tons annually.

Major items of this project were

Excavation  268,000 m3
Rebar Work 3,000 tons
Form Work 48,000 m2
Concrete Casting 48,200 m3
Construction of Buildings 35,000 m2
Construction and Erection of Steel Structure 2,200 tons
Road Construction 45,000 m2
Concrete Paving   100,000 m2
Installation of Instruments andEquipment 4,200 tons
   

prefabrication and Installation of


A/G Piping  2450 tons
U/G Piping 1150 tons 40,000 meters (m)
Cement and CastIron Piping 17,000 length. meters (l.m)
   

Electrical Works included

Cabling 190 km
Wiring 150 km
Conduit 50 km
   
Installation of Instrumentation and control included

Cabling  50 km

Insulation and Painting included

Insulation 35,000 m2
Painting 60,000 m2
   

Number of Direct Man Power at Peak in This Project was:   900

LAB COMPLEX FEED FACILITIES

PROJECT  LAB COMPLEX FEED FACILITIES
LOCATION ESFAHAN / IRAN
CLIENT IRAN CHEMICAL INDUSTRY INVESTMENT CO.
CONTRACTOR OIEC
CONTRACT EFFECTIVE DATE AUGUST 1992
CONTRACT DURATION 15 months (INCLUDING 2 months FOR MOBILIZATION)
BUDGETED man-hours 620,000 man-hours
EXPENDED man-hours 650,000 man-hours (REV. 12)
PROGRESS STATUS  COMPLETED (NOVEMBER 1993)
   
   
Scope of Works

- Construction of the Feed Facilities
- Erection and Commissioning of Interconnecting Systems Major Works


Excavation   30,000 m3
Rebar Work  200 tons
Form Work 5,100 m2
Concrete Casting  4,150 m3
Fabrication and Erection of Steel Structure 42 tons
Equipment Erection 850 tons
A/G Piping 104,000 inch meters (in-m)
U/G Piping 24,000 inch meters (in-m)
Electrical Cabling 20,000 meters (m)
Instrumentation Cabling 15,000 meters (m)
Painting of Equipment 15,900 m2

Number of Direct Man Power at Peak in this Project was:   120


ESFAHAN PETROCHEMICAL COMPLEX - FEED FACILITIES

PROJECT ESFAHAN PETROCHEMICAL COMPLEX - FEED FACILITIES
LOCATION ESFAHAN / IRAN
CLIENT ESFAHAN PETROCHEMICAL COMPANY
CONTRACTOR OIEC
CONTRACT EFFECTIVE DATE APRIL 1992
CONTRACT DURATION 20 months (INCLUDING 2 months FOR MOBILIZATION)
BUDGETED man-hours 55,000 man-hours
EXPENDED man-hours 170,000 man-hours (REV. 12)
PROGRESS STATUS  COMPLETED (APRIL 1993)
   

Scope of Work

Construction, Installation and Commissioning of Feed Facilities with a capacity of 184,000 metric tons yearly.


Major Items of this Project are:


Excavation   9,105 m3
Rebar Work 160,600 kg
Form Work 4,716 m2
Concrete Casting 1,350 m3
A/G & U/G Piping 109,000 inch meters (in-m)
Painting of Pipes 30,000. m2
   

Number of direct man power at peak in this project was: 50