Location: Assalluyeh, Persian Gulf / Iran
Client: Pars Oil and Gas Company
Partners: -
Scope of work: EPCC
Value: 4.5 Billion US
Man-hours: 120.000.000
Output:
Natural Gas: 50 million cubic meters per day
Stabilized Condensate: 80,000 barrels per day
LPG: 1 million tons per year
Ethane Gas: 1 million tons per year
Sulfur: 400 tons per day
|
The EPC contract for development of Phases 20 and 21 was signed in May 2009 between the National Iranian Oil Company (NIOC) and OIEC.
Offshore Facilities
Offshore Platforms
- One unmanned wellhead platform, for each phase of the project, equipped with the required production facilities
- Two relief platforms, each connected by bridges to the associated wellhead platform
Sea Lines
- Two 32” export sea lines (each with 4” piggy-back line) of 1000 mmscfd nominal capacity each will be installed to transport the raw offshore production from wellhead platforms to the onshore gas treatment plant
Onshore Facilities
- Receiving facilities for HP separation of raw gas and condensate / water mixture
- Condensate stabilization producing stabilized condensate for storage and export and light ends recycled in the HP gas system. One condensate flashing unit, normally not operated, is provided as a back-up of the stabilization facilities
- Gas treatment facilities producing sales gas, gaseous Ethane and NGL consisting of:
- H2S removal from gas / CO2 partial removal from gas
- dehydration unit, using molecular sieves technology
- Mercury guard
- Ethane extraction unit, producing sales gas, gaseous Ethane and NGL
- NGL fractionation facilities to produce sour liquid Butane and Propane
- Gaseous Ethane cut treatment for CO2 removal and drying for further export
- Propane and Butane treatment for Mercaptans removal and drying for further storage and export
- Propane and Butane separate atmospheric storage tanks (double wall), refrigerated and with reinforced concrete external walls
- Export gas compression to discharge the lean gas to pipeline pressure
- MEG regeneration and injection unit
- Sulfur recovery producing liquid Sulfur and solidification
- Off-site utilities, as required for operation
Drilling Operations
The following activities are generally required for drilling and testing 22 wells, including 2 appraisal wells (11 wells on each platform):
• Providing two cantilevered jack-up drilling rigs
• Procurement of all material required for drilling activities and completion
• Providing all necessary drilling services; i.e. mud, cementing, directional services, logging, etc.
• Logistics such as drilling operation base, supply boat, helicopter, etc.
• Drilling engineering and management
|