Qeshm Oil Terminal

OIEC has started the development of the crude oil and condensate gas storage project, with the capacity of 6.5 million barrels in South of Qeshm Island as a developer and investor in 2018. In this project, crude oil loading and offloading between onshore storage tanks and oil tankers is supposed to be done by a single point mooring (SPM) which is located in 4 Kilometers far from coast line through two 36” pipeline. Transferring capacity is designed to be 9,000 m³/h.

Picture Gallery

Location South of Qeshm Island/Iran
Client National Iranian Oil Company (NIOC)
OIEC Scope - Phase 1
Construction of 6 crude oil storage tanks with the capacity of 540,000 barrels each
- Phase 2
Construction of 5 crude oil storage tanks with the capacity of 540,000 barrels each
Construction of 2 crude oil storage tanks with the capacity of 270,000 barrels each
Increase in loading capacity to 6.5 million barrels
- Phase 3
Manufacturing and installation SPM along with the implementation of land and sea pipelines
- Phase 4 (Future Development Plan)
Construction of DSU unit (Sulfur Dismantling) of crude oil and bunkering
Storage Capacity 6.5 million barrels of crude oil