Qeshm Oil Terminal
OIEC has started the development of the crude oil and condensate gas storage project, with the capacity of 6.5 million barrels in South of Qeshm Island as a developer and investor in 2018.
In this project, crude oil loading and offloading between onshore storage tanks and oil tankers is supposed to be done by a single point mooring (SPM) which is located in 4 Kilometers far from coast line through two 36” pipeline. Transferring capacity is designed to be 9,000 m³/h.
Picture Gallery
Location | South of Qeshm Island/Iran |
Client | National Iranian Oil Company (NIOC) |
OIEC Scope |
- Phase 1 Construction of 6 crude oil storage tanks with the capacity of 540,000 barrels each - Phase 2 Construction of 5 crude oil storage tanks with the capacity of 540,000 barrels each Construction of 2 crude oil storage tanks with the capacity of 270,000 barrels each Increase in loading capacity to 6.5 million barrels - Phase 3 Manufacturing and installation SPM along with the implementation of land and sea pipelines - Phase 4 (Future Development Plan) Construction of DSU unit (Sulfur Dismantling) of crude oil and bunkering |
Storage Capacity | 6.5 million barrels of crude oil |