South Pars Gas Field Development – Phases 17 & 18


The development of phases 17 and 18 of South Pars gas field was awarded to a consortium of OIEC, IDRO and IOEC, producing 2MMMSCFD of natural gas and 80,000 barrels of gas condensate per day.
The onshore refinery was designed and constructed by OIEC and IDRO on the basis of supplying treated lean gas to domestic network and ethane gas to nearby petrochemical complex.

Picture Gallery

Location Assalluyeh, Persian Gulf / Iran Nowrouz Oil Field (Northwest of Persian Gulf, 50 Km north of Soroush Oil Field)
Client Pars Oil and Gas Company (POGC)
Partners Industrial Development and Renovation Organization of Iran (IDRO)
Iranian Offshore Engineering and Construction (IOEC)
OIEC Scope (Onshore) Engineering (basic and detailed design)
Procurement (supply of the equipment and bulk items, procurement services)
Construction (site preparation, plant construction and erection)
Commissioning (pre-commissioning, commissioning and start-up)
Products Natural Gas: 50 million m3 per day
Stabilized Condensate: 80,000 barrels per day
LPG: 2,900 tons per day
Ethane: 2,750 tons per day
Sulfur: 400 tons per day